Action Plan · Head of Manufacturing

30 · 60 · 90 days — Yield Optimization

Owner: Head of Manufacturing

First 30 days

Foundations
  • Conduct baseline assessment of first-pass yield and material waste at the Miamisburg RFID facility (current: 88% yield, 100 waste index).
  • Engage with Walmart program team to benchmark best-in-class yield performance and identify quick wins.
  • Map current-state process flows in the SAP Manufacturing Execution System (MES) for top three high-volume SKUs.
  • Establish daily reporting cadence for first-pass yield and material waste metrics in Power BI.

First 60 days

Validate
  • Implement root cause analysis on top two yield loss drivers using SAP MES data.
  • Pilot process adjustment on Gap/Athleta RFID label line to reduce defect rate (target: +4% yield improvement).
  • Deploy operator training module focused on critical control points, tracked in SAP SuccessFactors.
  • Review material waste streams with supply chain and procurement to identify 10% reduction opportunities.

First 90 days

Decide & scale
  • Roll out successful process changes to all RFID lines at Miamisburg, targeting 96% first-pass yield.
  • Validate material waste reduction to index 75 through monthly SAP MES and Power BI dashboards.
  • Present quantified results and lessons learned to Deon Stander and the executive team.
  • Develop scale-up plan for yield optimization to adidas and Burton Snowboards programs.